Process Safety Management (PSM) is a regulation issued by the U.S. Department of Labor's Occupational Safety and Health Administration (OSHA). The regulation is designated as OSHA 1910.119, Process Safety Management of Highly Hazardous Chemicals. Its purpose is to prevent or minimize the consequences of releasing hazardous chemicals in a facility or the environment surrounding a facility. Hazardous chemicals are those that may be toxic, reactive, flammable, explosive, or a combination of these properties. Industries handling hazardous chemicals are required to develop an effective PSM program that protects employees, contractors, and visitors of the facility. These industries include: petrochemical, pharmaceutical, paints, adhesives and sealants, food processing, industrial organics and inorganics, and paper mills.

Elements of OSHA 1910.119 - PSM of Highly Hazardous Chemicals

How do companies know they are complying with the OSHA regulation when implementing a PSM program? To answer this question, companies should be familiar with the following 14 elements that are required for PSM program compliance. These elements are the minimum requirements extracted from OSHA 1910.119 [1]. All information (date, equipment, personnel, process safety information, and process hazard analyses) should be recorded and stored in the event that future audits need to refer back to historical information about the facility and equipment.

1. Employee Involvement

All employees that play a role in facility operations should be involved in a PSM program. Each of the following elements requires a competent and experienced team of individuals. Ideally, a team should include at least one person who specializes in the specific process being used.

2. Process Safety Information (PSI)

The PSI element requires that employers collect and document highly hazardous chemical (HHC) information before conducting a process hazard analysis. This information pertains to the chemicals, technology, and equipment used in the process. Furthermore, the information should be accessible to all employees in order to understand the HHC related risks they may face during the job.

3. Process Hazard Analysis (PHA)

A PHA is performed by a team of engineering and maintenance experts that are able to identify, evaluate, and control hazards. PHAs can be conducted using a number of techniques, including:

Additionally, it’s important to make sure PHAs are performed in a timely manner as teams are expected to complete a certain amount of the analysis by specific deadlines. PHAs should be performed at least every 5 years [1].

4. Operating Procedures

Companies should document all operational procedures involving initial startup, normal operations, temporary operations, and emergency shutdowns. Operators should be aware of the operating limits of the process, the consequences if the process deviates from normal conditions, and be prepared to correct deviations when necessary.

5. Training

Employees should be trained on procedures, safety factors, and health hazards specific to the job task. Certification programs may help ensure that individuals are competent in specialized areas relative to their practices. Additionally, some practices require on-going training as methods and best practices continue to develop.

6. Contractor Safety

Companies should evaluate a contractor’s safety performance prior to starting a project (e.g. repair, turnaround, or renovation). Once a contractor passes clearance requirements, it is the responsibility of the company to inform the contractor of potential risks and health hazards related to the contractor’s project. The contractor’s responsibility is to inform the incoming contracted team of risks and health hazards and to ensure contracted employees have received and understood necessary training.

7. Pre-Start Up Process Safety Review

Companies are required to perform a safety review before new or modified facilities begin production. The pre-start up safety review confirms that an initial PHA has been performed and that all safety, operating, maintenance, and emergency procedures meet the requirements of codes, standards, and specifications [1].

8. Mechanical Integrity

Routine inspections are required for major process units and equipment, such as pressure vessels, storage tanks, piping systems, relief and vent systems, emergency shutdown systems, control systems (e.g. monitoring devices and sensors), and pumps to ensure the mechanical integrity of the component meets requirements. All inspections and tests need to be well-documented and must follow recognized and generally accepted good engineering practices (RAGAGEP).

9. Hot Work Permit

This mandate requires that employers issue hot work permits for personnel performing high-temperature operations on equipment (e.g. welding).

10. Management of Change

A company needs to have an organized and efficient process for managing procedural changes regarding process chemicals, technology, and/or equipment. Under the OSHA 1910.119 standard, each change requires that the following considerations be addressed:

  • The technical basis for the proposed change
  • The impact of change on safety and health
  • Modifications to operating procedures
  • Necessary time period for the change
  • Authorization requirements for the proposed change [1]

11. Incident Investigation

Investigations should be performed on incidents that resulted in (or could have resulted in) catastrophic HHC release. Incident investigations should report:

  • The date of the incident
  • The date of the investigation
  • The description of the incident
  • The root causes that contributed to the incident
  • Any recommendations or solutions resulting from the investigation

12. Emergency Planning and Response

Companies are required to develop and implement emergency action plans for the entire facility. Emergency plans include procedures for mitigating large and small releases of HHCs.

13. Compliance Audits

Individuals should recertify their credentials at least every three years to keep up-to-date with evolving practices and technology. This element also states that companies should retain the 2 most recent compliance audit reports.

14. Trade Secrets

This mandate ensures that employees involved in elements 2-13 have access to the information about the process and health risks they may encounter during the job.

References

  1. 29 CFR 1910.119, Process Safety Management of Highly Hazardous Chemicals, OSHA.

 

Related Topics

Relevant Links

Topic Tools

Share this Topic

Contribute to Definition

We welcome updates to this Integripedia definition from the Inspectioneering community. Click the link below to submit any recommended changes for Inspectioneering's team of editors to review.

Contribute to Definition
Articles about Process Safety Management (PSM)
March/April 2023 Inspectioneering Journal

A review of the plan one site put in place to upgrade their performance from the fourth quartile to the first quartile and keep it there.

Authors: John Reynolds
Blog

Do you know how a Good Engineering Practice (GEP) becomes a RAGAGEP? RAGAGEP clearly applies to all kinds of equipment, but this article will address RAGAGEP for FEMI used in the hydrocarbon and chemical process industries.

Authors: John Reynolds
Blog

What happens when there are programs no one wants to own and people avoid taking responsibility for them? It is important that people have an understanding of their responsibilities and the accountabilities of the program.

Authors: Inspector Frank
Blog

There are still lessons to be learned 48 years after the failure of the cyclohexane plant that led to the explosion that occurred on Saturday, June 1, 1974.

Authors: Inspector Frank
September/October 2021 Inspectioneering Journal

This follow-up article discusses the important topic of establishing Heat Exposure Zones and Level 1, 2, and 3 fitness-for-service assessments following a plant fire.

Authors: Greg Garic, P.E.
Partner Content

Our proprietary furnace tube inspection system, FTIS is an ultrasonic inspection technology capable of rapid, automated fired heater coil inspection in refinery fired heaters. The data captured by our furnace tube inspection system is...

July/August 2021 Inspectioneering Journal

Part 1 presents a brief overview of the process of assessing equipment in a post-fire "return-to-service" effort and discusses some common issues that may arise during that process.

Authors: Greg Garic, P.E.
Blog

The article discusses how allowing ‘normalization of deviance’ to occur in the workplace raises our organizations’ risk threshold in an uncontrolled and unmanaged way.

Authors: Inspector Frank
Blog

This article discussed the growing list of API FEMI standards, how some of them came to be, and why they keep getting improved upon with new lessons learned.

Authors: John Reynolds
Blog

We live in a world of metrics and key performance indicators. This isn’t a bad thing; in fact, it is vitally important. Good PSM requires accurate and complete metrics in order to ensure the systems are working the way they should.

Authors: Inspector Frank
Blog

This is the first article in a new column. In each article, the author will explore how different parts of organizations can partner to discover new efficiencies, improved equipment integrity, and opportunities to capture additional margin.

Partner Content

Equity Engineering Practices® (EEPs) are a collection of design and maintenance focused corporate standards that include >850 engineering standards, and >300 piping classes. Enhance your mechanical integrity programs, improve equipment...

Blog

Have you ever wondered why, even though inspection reports are one of the primary keys to a good MI program, they are so rarely reviewed? One of the things I always find when reviewing a program is the lack of concise inspection history.

Authors: Mike Hurley
November/December 2020 Inspectioneering Journal

IOWs are an important component of a world-class mechanical integrity program. In order to have a robust IOW program, the integration of IOWs into other areas of PSM is critical. This article provides four concrete examples of integration.

Blog

I once worked with a chief inspector who refused to hire anyone who had any National Board inspection certifications. “Why?”, you might ask. I had the same question, and his response was “Because anyone with National Board is gunning for my...

Authors: Inspector Frank
Blog

Critical things often get missed in facilities but are these things being owned and fixed? We get good at reactively solving problems as they appear, but are we proactively working towards examining and fixing the potential larger issues?

Authors: Inspector Frank
Blog

Just because you have a technical expert does not mean they will be an expert at managing people. Like any skill set, it takes training, time, and mentoring to become a good personnel manager.

Authors: Inspector Frank
Partner Content

Are you truly prepared for your next Turnaround? Effective work processes are required to successfully plan, manage, review and supervise plant turnarounds. Inspection planning and work scope selection are critical aspects of any turnaround...

Blog

This is the first article in a new column. In each article, the author will share technical, thought-provoking, and sometimes humorous or emotional experiences garnered in a career that spans over 20 years inside the gates of facilities.

Authors: Inspector Frank
March/April 2019 Inspectioneering Journal

Creating a proper work scope and developing and executing an effective work plan are essential for a successful turnaround. However, behind the scenes exists the glue that pulls the entire effort together: logistics.

Authors: Stephen Thomas
January/February 2019 Inspectioneering Journal

This article provides a summary of the 2019 API Inspection & MI Summit keynote address, which offers a past, present, and future outlook on fixed equipment mechanical integrity from an industry professional with 50+ years of experience.

Authors: John Reynolds
Blog

The U.S. Department of Labor provides a vast amount of raw data related to OSHA activities (inspections, violations, etc.) through their website. What follows is a quick summary of 2016-2017 OSHA violation data pulled directly from the DOL.

Authors: Nick Schmoyer
November/December 2018 Inspectioneering Journal

This article describes how an international oil and gas company built an inspection data management program for its U.S. operations yielding improved confidence in decision-making information, cost savings through increased efficiency, and an...

Authors: Efrain Rios
Partner Content

Traditional, paper-based inspection processes can prevent plants from being as effective as they can be. By digitalizing your mechanical integrity process and data with MISTRAS Digital®, plants have realized up to 75% gains in IDMS data entry and...

November/December 2018 Inspectioneering Journal

This article discussed the importance of an asset management philosophy that integrates software, maintenance tools (RCM, FMECA, RBI, PM, and PdM), data collection, and analytics to improve and optimize asset management through emerging technologies...

Authors: Mike Asquini
November/December 2018 Inspectioneering Journal

This article provides an overview of the key components in establishing IOWs, the levels of IOW limits, and the basic principles and application of API Recommended Practice 584 to achieve reliable fired heater performance.

Authors: Tim Hill
September/October 2018 Inspectioneering Journal

The most valuable unit of measure within a turnaround is not money, but time. Successful turnaround planners are now integrating the Detailed Inspection Planner (DIP) within their teams to increase the accuracy of planning and reduce the time...

July/August 2018 Inspectioneering Journal

Advancements in technology offer organizations huge opportunities for improvement. However, adoption of new tools can change the way an organization functions. If not properly managed, these changes can lead to wasted time and money and ultimately,...

Authors: Stephen Thomas
May/June 2018 Inspectioneering Journal

According to API 570, facilities must have a mechanical integrity program in place for critical check valves. But what criteria determines whether or not a check valve is critical in your process? How should check valves be inspected and by whom?

Partner Content

Antea delivers highly flexible risk-based asset integrity software with 3D Digital Twin integration to optimize maintenance, reduce risk, and improve mechanical integrity for oil and gas, power generation, and chemical plants and facilities....

May/June 2018 Inspectioneering Journal

As assets age and production demands grow, it becomes increasingly critical to implement sustainable long-term AIM strategies and programs. This article dives into the elements that will help ensure the successful management of assets throughout...

May/June 2018 Inspectioneering Journal

This article intends to use a top-down approach of describing RBI methodology and how it fits in a facility management system. The main idea of this article is to provide a comprehensive picture of RBI methodology in terms of basics, technology...

Authors: Dheeraj Narang
January/February 2018 Inspectioneering Journal

This article, the first of a multi-part series, discusses the methodology and need for establishing an integrated and holistic framework for managing asset integrity on a day-to-day basis.

Authors: Mohamed Attia
Blog

Last October, we saw the State of California implement its “PSM for Refineries” standard and now the State of Washington’s Division of Occupational Safety and Health (DOSH) appears to be following suit, releasing draft language to adopt a...

Authors: Daniel J. Grucza
September/October 2017 Inspectioneering Journal

Although value-drivers often differ between facilities, all can agree that effective asset management strategies should lead to better decision making. In this case study, the authors detail how process-based risk management strategies can make for...

Partner Content

The OmniScan™ X3 64 phased array and TFM flaw detector is equipped with enhanced phased capabilities and even faster TFM. The rugged and portable instrument features powerful 64-element probes with a 128-aperture TFM.

September/October 2017 Inspectioneering Journal

Ensuring the integrity of oil and gas assets is a challenge for oil and gas operators. This article discusses several “pillars” of asset integrity management on which successful O&G operations rely, including Material Selection, Process...

Authors: Tata L.N. Murthy
Blog

The U.S. Occupational Safety and Health Administration (OSHA) recently released a new guide to help petroleum refiners comply with its Process Safety Management (PSM) standard (1910.119). The guide presents lessons learned from the petroleum...

Authors: Jeremiah Wooten
July/August 2017 Inspectioneering Journal

In deflagration incidents, electrical arcs and electrostatic sparks are often considered to be primary ignition sources. However, there are a variety of other ignition sources. Do you consider mechanical equipment and the significant non-electrical...

Authors: Richard W. Prugh
Blog

The U.S. Occupational Safety and Health Administration (OSHA) has issued two reports on the safe management of hazards by small businesses and storage facilities that use highly hazardous chemicals in business processes.

March/April 2017 Inspectioneering Journal

Myths, challenges, and good practices related to process piping integrity management activities that help inspection and maintenance managers make the right decisions to develop cost-effective piping inspection plans without compromising the...

Partner Content

Ethos has assembled a team of experts who apply what they learned through years of process safety experience in the industry and dealing with OSHA and EPA. Click here to learn more about our services.

January/February 2017 Inspectioneering Journal

Some facilities lead the industry with streamlined RBI/IOW programs, and some facilities are just implementing standard calendar-based programs. Both are still susceptible to inspection interval gaps.

Authors: Chuck Provost
November/December 2016 Inspectioneering Journal

As the industry strives to maintain PSM/OSHA compliance through owner/user mechanical integrity programs, inspection professionals should fully understand technical standards to generate an adequate repair recommendation or request further...

Authors: Blake Stermer
May/June 2016 Inspectioneering Journal

This paper identifies the attributes and benefits of a data and metrics-driven management system focused on process safety design integrity and reliability relative to loss of primary containment (LOC). This management system process focuses on the...

November/December 2015 Inspectioneering Journal

To ensure the mechanical integrity and fitness-for-service (FFS) of equipment, facility managers, reliability engineers, and inspection technicians must understand the HTHA damage mechanism.

September/October 2015 Inspectioneering Journal

If we could measure, understand, mitigate, and most importantly, control corrosion, we can do a better job of keeping the product in the pipes. To accomplish this task, we needed to know what is causing the corrosion and how to control it.

Partner Content

Traditional inspection methods used to detect internal corrosion and corrosion under insulation (CUI) in piping and pipeline assets can be time-consuming and costly. With ART, you’ll discover CUI detection best practices that can help save you up...

Blog

OSHA has recently issued three memoranda updating guidance on its Process Safety Management (“PSM”) standard.

Authors: Linda Otaigbe
Online Article

In the oil & gas, chemical and petrochemical industries, identifying, understanding, and controlling process hazards in order to prevent process-related injuries and incidents is of the utmost importance. EPA and OSHA have released numerous...

Blog

A memorandum released by OSHA provides a list of 16 enforcement considerations when evaluating whether an employer is meeting the RAGAGEP requirements under the PSM standard. Here are 8 tips for addressing OSHA's new enforcement guidance.

Online Article

Now more than ever, processing plants are in need to ensure their facilities are equipped with the tools and methodologies necessary to ensure safe and efficient operations. The development of regulations and industry standards are prompting plants...

Online Article

Michael Heard, Risk Engineering Advisor, Process Safety / Technical Safety / Environmental at Hess Corporation recently spoke with marcus evans about key topics to be discussed at their upcoming Facility Siting and Risk Mitigation for Processing...

Partner Content

Learn how you can safeguard integrity, reliability, instrumentation safety, and more.

March/April 2015 Inspectioneering Journal

Today, many managers are finding that they can address the reliability of all types of assets by combining RBI and Reliability Centered Maintenance (RCM) processes together into one comprehensive reliability management process.

Authors: Walt Sanford
November/December 2014 Inspectioneering Journal

Key Performance Indicators or KPIs are important for businesses to track measurable progress, or a lack thereof, as compared to pre-defined goals or benchmarks. For those of us in the inspection, fixed equipment reliability world, the same holds...

Blog

One of the reasons we continue to have too many fixed equipment mechanical integrity (FEMI) events in the refining and process industries is the lack of understanding and appreciation by site management for the hazards posed by the 101 FEMI issues.

Authors: John Reynolds
Blog

For over 20 years OSHA's process safety management (PSM) standard worked to guarantee safe and healthy workplaces in industries that use hazardous chemicals. For most of that time the standard had remained largely unmodified. This all changed last...

Authors: Nick Schmoyer
July/August 2014 Inspectioneering Journal

The Province of Alberta has a long history of pressure equipment safety dating back to 1897 when the first boiler laws were introduced to regulate the new technology of steam boilers. Boiler inspectors were hired, and soon thereafter the Alberta...

Authors: Jeremiah Wooten
Partner Content

Say goodbye to juggling multiple tools! Our all-in-one solution automates NDT data acquisition and seamlessly transfers it to your inspection data management system. Simplify your workflow today - use DIMATE PACS!

July/August 2014 Inspectioneering Journal

Piper Alpha is an offshore oil and gas platform that suffered an explosion in July 1988, still regarded as the worst offshore oil disaster in the history of the United Kingdom. The 25th anniversary of the disaster was commemorated across the...

Authors: Jerry Crawford
Blog

Fixed equipment mechanical integrity (FEMI) failures are not caused by damage mechanisms; rather, they're caused due to failure to create, implement, & maintain adequate management systems to avoid failures. Nearly all failures that have occurred...

Authors: John Reynolds
November/December 2013 Inspectioneering Journal

It is with sadness that I learned of the passing of one of the world’s greatest authorities on chemical process safety, Dr. Trevor Kletz; a man I deeply respected and admired for his commitment to improving safety, preventing accidents, and...

Authors: Greg Alvarado
September/October 2013 Inspectioneering Journal

Earlier this year, our friends at Pinnacle Asset Integrity Services hosted a webinar entitled Mechanical Integrity Assessment: Why Bother? The broadcast included discussions on the history and value of asset integrity programs, as well as the...

Authors: Jeremiah Wooten
Online Article

Though new regulations have changed the way offshore companies operate, the need to make safety part of an enterprise sustainability management strategy has never been more important. As accountability moves higher up the chain of command, operators...

Partner Content

FER's extensive TA experience, combined with our custom software (RAMI Scope) that tracks all aspects of TA activities, we have the ability to keep your turnaround flowing flawlessly with the methodology to maximize your value of premium time.

Online Article

Though new regulations have changed the way offshore companies operate, the need to make safety part of an enterprise sustainability management strategy has never been more important.

July/August 2013 Inspectioneering Journal

I have written numerous technical articles addressing how to improve your fixed equipment mechanical integrity (FEMI) program. This time I will deviate from the FEMI technologies and methodologies to address a topic that may be equally...

Authors: John Reynolds
July/August 2013 Inspectioneering Journal

The Process Safety Management Rule (29 CFR 1910.119 - PSM) has long been recognized as a collection of interdependent requirements. In recent reviews of PSM programs by OSHA, it has been shown that two of the most cited elements in agency audits...

Authors: Holly F. Baker
July/August 2013 Inspectioneering Journal

Each year about 14,000 oil spills are reported, according to the EPA. It is estimated that there are 618,000 facilities that are regulated under EPA SPCC in the United States.

Authors: Dana Schmidt
Blog

This is my third of three posts on Key Performance Indicators (KPIs) based on requests and discussions on the issue.

Authors: Greg Alvarado
March/April 2013 Inspectioneering Journal

A pattern of requests for key performance indicators (KPIs) related to equipment integrity management (IM) programs has appeared on Inspectioneering’s LinkedIn group discussion as well as other industry forums. Furthermore, the topic came up...

Authors: Greg Alvarado
May/June 2012 Inspectioneering Journal

The Mary Kay O'Connor Process Safety Center is currently seeking nominations for the annual Merit Award and Harry West Memorial Service Award, to be presented at the 2012 Annual Symposium.

September/October 2011 Inspectioneering Journal

Maintenance has been around since prehistoric man fixed a broken, trusted spear instead of fashioning a new one. One concept of maintenance is any activity that extends the useful life or enhances the performance of an item of interest. A broad...

Authors: Barry Snider
May/June 2011 Inspectioneering Journal

Putting off the initial inspection (i.e. baseline) of piping and vessels in a new process unit is both common and problematic. The tendency of owners is to rely on the nominal thickness because the actual original thickness was either not measured...

March/April 2005 Inspectioneering Journal

We are happy to announce the 10-year anniversary of the inaugural issue of the Inspectioneering Journal!

Authors: Greg Alvarado
March/April 2005 Inspectioneering Journal

One of the more important uses of the 99 Diseases of Hydrocarbon Process Equipment is to determine how to safely operate process pressure equipment. Such a work process thereby minimizes the impact of any potential degradation mechanisms (the 99...

Authors: John Reynolds
July/August 1998 Inspectioneering Journal

Regulatory, civic and competitive pressures require we change to a proactive, rather than a reactive culture or environment with a supportive infrastructure. The concurrent evolution of cultural and infrastructural change relies upon effective...

Authors: Roy Schuyler
May/June 1996 Inspectioneering Journal

Since OSHA began issuing citations under the Process Safety Management (PSM) standard (29 CFR 1910.119) the relative frequency of citations related to some subsections of the regulation has increased dramatically, while the frequency of others has...

May/June 1995 Inspectioneering Journal

The United States Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA) standard 29 CFR 1910.119, "Process Safety Management of Highly Hazardous Chemicals," has been in effect since may of 1992. To enforce this...

    Companies
    Videos related to Process Safety Management (PSM)
      Training Courses related to Process Safety Management (PSM)
        Training Course

        This course addresses the breadth and depth of an asset (mechanical) integrity program. Whether you are developing a new program or are responsible for updating/auditing an existing program, this course is packed full of practical, proven techniques.

        Training Course

        Learn how to effectively identify the equipment that should be included in a facility's process safety management program, specifically the facility’s mechanical integrity program.

        Downloads & Resources related to Process Safety Management (PSM)
          Checklist

          The Mechanical Integrity Audit Checklist serves as a companion piece to the Inspectioneering webinar, Auditing My Mechanical Integrity Program, presented by Mr. Reuben Laurel.

          News related to Process Safety Management (PSM)

            Inspectioneering Journal

            Explore over 20 years of articles written by our team of subject matter experts.

            Company Directory

            Find relevant products, services, and technologies.

            Training Solutions

            Improve your skills in key mechanical integrity subjects.

            Case Studies

            Learn from the experience of others in the industry.

            Integripedia

            Inspectioneering's index of mechanical integrity topics – built by you.

            Industry News

            Stay up-to-date with the latest inspection and asset integrity management news.

            Blog

            Read short articles and insights authored by industry experts.

            Expert Interviews

            Inspectioneering's archive of interviews with industry subject matter experts.

            Event Calendar

            Find upcoming conferences, training sessions, online events, and more.

            Downloads

            Downloadable eBooks, Asset Intelligence Reports, checklists, white papers, and more.

            Videos & Webinars

            Watch educational and informative videos directly related to your profession.

            Acronyms

            Commonly used asset integrity management and inspection acronyms.