
Date | January/February 2011 |
Volume | 17 |
Issue | 1 |
Return to Journal Index |
January/February 2011 Inspectioneering Journal Article Index
-
January/February 2011 Inspectioneering JournalBy Del Underwood at Det Norske Veritas
A continually frustrating phenomenon to many of us is the situation where a tight bolt will function satisfactorily, but in the same situation, a loose bolt will fail...
-
January/February 2011 Inspectioneering Journal
Washington DC, January 27, 2011 - A U.S. Chemical Safety Board (CSB) case study released today on the 2008 heat exchanger rupture and ammonia release at the Goodyear Tire and Rubber Company in Houston, Texas, identifies gaps in facility emergency...
-
January/February 2011 Inspectioneering JournalBy Leo Vega at Stress Engineering Services, Inc.
Describes a non-destructive sampling procedure which records and preserves the topography of a metallographic specimen as a negative relief on a plastic film (replica).
-
The Role of Life Cycle Management in Achieving Excellence in Pressure Equipment Integrity and ReliabilityJanuary/February 2011 Inspectioneering JournalBy John Reynolds at Intertek
In the first article in this series entitled How to Put It All Together - Guide to Organizing a Successful PEI Program, (1) I provided an overview of the necessary Management Systems (MS) for a successful program to achieve excellence in pressure...