Inspectioneering

Redirected from ram analysis

Reliability is a special attribute that describes the dependability of a component. This means that the component consistently performs a desired function under certain conditions for a certain period of time in order to meet business goals and customer needs. Theoretically, reliability can be described as:

Reliability = 1 - Probability of Failure

Thus, the lower the probability of failure, the greater the reliability of the system. However, there are many factors that can contribute to the uncertainty involved with any new design and capital project including variations in materials, manufacturing plants, shipping, storage, and use.

Another way of thinking about reliability is the quality of the component over time. A common term used in a reliability engineering context is mean time between failures (MTBF). MTBF is a metric that describes the average time it takes for a specific component to failure. MTBF does not measure the time when a component is waiting for repair or being repair; rather, it measures the time only when the component is operating. This is an important parameter to consider in the decision-making process when investing in new equipment. The higher the MTBF the higher the reliability of the product.

Reliability Engineering

The responsibility of a reliability engineer is to increase the dependability and safety of a component in service. Additionally, reliability engineers work together with design, inspection, and maintenance individuals to identify failures and their causes. Common tools reliability engineers use across the entire equipment lifecycle include:

Furthermore, reliability engineers are expected to be able to align equipment performance with business goals, identify risks and failure modes, estimate remaining life and performance, and minimize variability.

Common Responsibilities of a Reliability Engineer

Reliability engineers are expected to:

  • Notify management of upcoming inspections and recommendations, deficiencies in processes, and corrective actions.
  • Use probability and statistic tools for risk and process hazard assessments.
  • Comply with standards and specifications defining requirements for design, construction, inspection, testing, decommissioning, and integrating new components with aging infrastructure.
  • Analyze and interpret reliability data and provide recommendations on how the data can be used to measure and improve performance and reliability.
  • Understand the value of reliability and how to build a business case
  • Establish testing, inspection, and maintenance priorities and recommend frequency in which these procedures should be performed.
  • Develop strategies for planning, inspecting, and maintaining the reliability of assets throughout the equipment’s lifecycle.
  • Measure and report key performance indicators.
  • Understand the value of investing in reliability and how to build a business case to present to the owners of the company.
  • Lead change (i.e., change in processes, strategies, etc.).
  • Stay informed about new and developing processes.
  • Maintain equipment history and inspection and maintenance records. Data should be stored in a centralized computer maintenance management system. Changes to data can only be done so in a master database system.

Certification and Training

A certified reliability engineer is one who aims for performance improvement and manages asset safety, reliability, and maintenance throughout the component’s life cycle.2 A combination of professional work experience and education are considered for certification. The following outline provides an overview of specific topics that a reliability engineer should be familiar with for certification. A detailed list of the minimum necessary knowledge and skills can be found in the Body of Knowledge document.3

  1. Reliability Management
  2. Probability and Statistics for Reliability
  3. Reliability in Design and Development
  4. Reliability Modeling and Predictions
  5. Reliability Testing
  6. Maintainability and Availability
  7. Data Collection and Use

Equipment Reliability

Strategy for Optimizing Equipment Reliability

Equipment reliability is measured in terms of quality, performance, and productivity. The goal of an equipment reliability program is to effectively monitor equipment, procedures, and data covering the life of equipment. Advantages of a reliability program include eliminating unexpected shutdowns, reducing production losses that occur between start-up and operation, and extending the life of the asset. Additionally, company’s typically experience a reduction in costs of repair and maintenance, reduction in delay, and increases in safety.

Methods to Ensure Reliability of Equipment

Besides the engineering practices described above, there are three other essential components to equipment reliability: maintenance, inspection, and technology.

1) Maintenance

Maintenance can be divided into three categories, preventive, predictive, and corrective maintenance. Preventive measures are taken to eliminate unnecessary inspection and repair tasks. Predictive maintenance generally involves nondestructive inspection techniques to monitor the serviceability of the equipment. Corrective maintenance involves repairing or replacing components to restore equipment back to its operating conditions. Collectively, these tasks should be managed in a well developed reliability centered maintenance program.

2) Inspection

Nondestructive testing (NDT) techniques are used extensively throughout the lifecycle of equipment to locate and monitor damage mechanisms. Furthermore, inspection plays a major role in any equipment reliability program. Some common NDT methods used in the petroleum and chemicals industries include radiographic testing, ultrasonic testing, electromagnetic testing, and many more. When selecting an NDT method several considerations should be taken into account including the type of damage, where the damage is located (external or internal), and the size, shape, and orientation of the damage.

Additionally, there are two other types of inspection that provide information on the reliability and remaining life of equipment. These include risk-based inspection (RBI) and fitness-for-service (FFS) assessments. Put simply, the purpose of RBI is to identify and understand risk in order to reduce uncertainty about the condition of equipment. FFS assessments are performed to determine if a component is suitable for continued service.

3) Technology

New advancements in technology, such as sensors, will be able to greatly improve the overall reliability of the system. Sensors can provide data on the performance and condition on the equipment in real-time to make better decisions for preventive, predictive, and corrective maintenance.

References

  1. Schenkelberg, Fred. “Introduction to Reliability Engineering Management.” Inspectioneering Journal, vol. 21, no. 1, 2015.
  2. Reliability Engineer Certification offered by the American Society for Quality (ASQ)
  3. ASQ Certified Reliability Engineer (CRE) Body of Knowledge

Relevant Links

Topic Tools

Share this Topic

Contribute to Definition

We welcome updates to this Integripedia definition from the Inspectioneering community. Click the link below to submit any recommended changes for Inspectioneering's team of editors to review.

Contribute to Definition
Articles about Reliability
November/December 2023 Inspectioneering Journal

In this article, we’ll discuss the current challenges with turnaround planning and how data-driven modeling can help optimize scope, duration, and intervals.

Authors: Lewis Makin
November/December 2023 Inspectioneering Journal

With the latest digital and predictive technologies made possible by IIoT, the principles of reliability-centered maintenance have become easier to implement.

Blog

Embracing technology alone isn't the answer in industry problem-solving. A synergy of data-driven approaches and human expertise unlocks true potential.

Authors:
September/October 2023 Inspectioneering Journal

Addressing the sustainability of MI initiatives, specifically integrated, systematic processes and programs like RBI, RCM, APM, and EAM programs.

Authors: Greg Alvarado
July/August 2023 Inspectioneering Journal

This article features a discussion of three of the key elements to sustain and improve your mechanical integrity program successfully.

Partner Content

Are you truly prepared for your next Turnaround? Effective work processes are required to successfully plan, manage, review and supervise plant turnarounds. Inspection planning and work scope selection are critical aspects of any turnaround...

Blog

Safety and reliability should not be at odds with one another; in fact, they contribute to one another’s success.

Authors: Greg Alvarado
May/June 2023 Inspectioneering Journal

A look at the three types of fixed equipment mechanical integrity (FEMI) decision-makers you can encounter, along with the differences in the effectiveness of each.

Authors: John Reynolds
March/April 2023 Inspectioneering Journal

A look at common reliability issues to help give perspective on where issues may be waiting and how to handle them when they arise.

Blog

Maintaining the longevity and success of a reliability program requires evergreening, a continuous effort to keep processes up-to-date and relevant.

Authors: Pinnacle
September/October 2022 Inspectioneering Journal

While data science has the power to revolutionize the reliability industry, it will only do so with strong guidance from SMEs. This combination enables facilities to develop solutions to challenges based on each method’s unique strengths.

Partner Content

TEAM provides full inline, onsite and, shop valve repair services and maintenance programs for virtually all valve types, brands, sizes, materials, pressures, and operating conditions, including actuators and operators. Our valve repair solution...

May/June 2022 Inspectioneering Journal

A case study on utilizing the Quantitative Reliability Optimization (QRO) methodology to help better evaluate equipment risk and predict future product availability.

Blog

Of the nearly 70 damage mechanisms listed in the latest edition of API RP 571, the highest FEMI risk may be the ones that are highly localized in nature and, therefore, the hardest to find.

Authors: John Reynolds
Blog

Every year, Inspectioneering hosts a private meeting to glean insights, feedback, and guidance from our Editorial Board members. This time around we posed several questions, with responses to each summarized in this note from our chief editor.

Authors: Greg Alvarado
Blog

An approach such as LVC can help enhance API 581 POF calculations for thinning. This method has proven to increase accuracy, precision, and has the flexibility to handle one-off cases that are handled manually today.

Authors:
Blog

There is a major difference between fixed equipment mechanical integrity (FEMI) and fixed equipment reliability (FER). It’s important to differentiate between the purpose and reasons for the two programs even when they are often mixed together.

Authors: John Reynolds
Partner Content

Pinnacle's data-driven reliability framework ensures the right data is fueling the right intelligence, helping you make confident, strategic decisions.

January/February 2022 Inspectioneering Journal

Inspectioneering and Pinnacle co-hosted the 8th bi-annual Meeting of the Minds with a select group of mechanical integrity experts from across the industry. The meeting focused on major projects in equipment integrity and reliability.

Authors: Jeremiah Wooten
November/December 2021 Inspectioneering Journal

A historical review into the integrity of reformer furnaces since commissioning is discussed in this case study, along with other technical and engineering challenges, and the efforts to overcome them.

Authors: Iqbal Hussain
November/December 2021 Inspectioneering Journal

Utilizing a risk assessment methodology to determine the amount of detail in our QA/QC plans, as well as who needs to be involved, may help us improve both the effectiveness and the efficiency of our QA/QC work process.

Authors: John Reynolds
November/December 2021 Inspectioneering Journal

This article is Part 2 in a series discussing condition monitoring optimization where statistical inference techniques on the measured data can be utilized to provide reasonable expectations regarding the true extent of damage on the asset.

September/October 2021 Inspectioneering Journal

The positive impact of digital twins on planning, costs, turnaround, revenue generation, and safety are substantial and rapid in their return. This article will examine why to leverage this technology and how to do so in a fiscally viable manner.

Authors: Floyd Baker
Partner Content

Download Pinnacle's Economics of Reliability Report - Refining to see how reliability is affecting profitability.

September/October 2021 Inspectioneering Journal

Condition monitoring optimization goes beyond traditional CML optimization, which is often limited in the breadth of analysis, or can overemphasize a subset of the overall objective.

September/October 2021 Inspectioneering Journal

This article discusses making continuous improvements in your fixed equipment mechanical integrity work process using the Plan-Execute-Review-Improve (PERI) model.

Authors: John Reynolds
Blog

The results of the analysis demonstrate the exciting possibilities for how “Big Data” can be used to empower the reliability and corrosion engineer to solve real-world reliability challenges faster and more accurately than current industry...

Authors:
Blog

Acting as a reliability twin, QRO is a new dynamic reliability approach that bridges existing first principles-based reliability models with advanced data science principles and system-based optimization to drive improved facility performance.

Authors:
July/August 2021 Inspectioneering Journal

This article discusses how composite materials can be used to mitigate light CUI damage and/or repair and restore structural strength to the affected piping system.

Authors: Casey Whalen
Partner Content

Traditional pressure vessel inspections often require taking assets out of service. However, MISTRAS’ Non-Intrusive Inspection (NII) programs provide data as good or better than internal inspections, while assets remain in service. NII is...

Blog

Quantifying corrosion for different crude fractions allows planners the ability to mix and match crude blends alternatively to achieve pre-set metal loss and reliability goals. This flexibility has significant implications for extensive cost savings.

July/August 2021 Inspectioneering Journal

This article examines the quantitative tank RBI method found in API 581 and discusses uses for tank RBI other than deferral of scheduled internal inspections.

July/August 2021 Inspectioneering Journal

A risk management approach for relief valves should be able to determine the proper interval of maintenance events and the necessity of installing isolation valves, rupture discs, or 100% spare capacity.

Blog

The article discusses how allowing ‘normalization of deviance’ to occur in the workplace raises our organizations’ risk threshold in an uncontrolled and unmanaged way.

Authors: Inspector Frank
Blog

While collecting more data may seem like the solution, the key to successfully forecasting system availability is building a strong program based on existing data. This can be accomplished through Quantitative Reliability Optimization (QRO).

Authors:
Partner Content

Antea delivers highly flexible risk-based asset integrity software with 3D Digital Twin integration to optimize maintenance, reduce risk, and improve mechanical integrity for oil and gas, power generation, and chemical plants and facilities....

May/June 2021 Inspectioneering Journal

This article describes an owner-user’s evergreening process to maintain accurate data to support the mechanical integrity program and assist in planning inspections, turnarounds, repairs, replacements, and upgrades.

Authors: Ben Charlton
May/June 2021 Inspectioneering Journal

This article discusses how Quantitative Reliability Optimization (QRO) can help empower reliability and operations leaders with better data to make smarter and more confident reliability decisions for their facilities.

Blog

As the industry continues to collect more data, many facilities are unable to confidently leverage it to drive better reliability decisions because they do not collect the correct type or amount of data, which leads to unknown risks.

Authors:
Blog

This is the first article in a new column. In each article, the author will explore how different parts of organizations can partner to discover new efficiencies, improved equipment integrity, and opportunities to capture additional margin.

March/April 2021 Inspectioneering Journal

The manner by which reliability is achieved is experiencing a much-needed paradigm shift in the way it uses data. In this article, we’ll explain how you can leverage this industry shift to implement data-driven reliability at your facility.

Authors: Sean Rosier
Partner Content

The OmniScan™ X3 64 phased array and TFM flaw detector is equipped with enhanced phased capabilities and even faster TFM. The rugged and portable instrument features powerful 64-element probes with a 128-aperture TFM.

January/February 2021 Inspectioneering Journal

The first two parts of this series covered the basics of fracture mechanics and how the FAD is interpreted. This article touches on a few practical points regarding the application of fracture mechanics in a plant environment.

Authors: Greg Garic, P.E.
January/February 2021 Inspectioneering Journal

Restoring process piping within a short time frame requires an innovative approach. This article discusses how a repair using composite materials proved to be successful and enabled a quick return to operations.

November/December 2020 Inspectioneering Journal

Every fitness-for-service (FFS) assessment must have a well-defined acceptance criterion. For many damage mechanisms, it’s the “remaining strength factor” (RSF). But for crack-like flaw assessment, it’s the Failure Assessment Diagram, or FAD.

Authors: Greg Garic, P.E.
November/December 2020 Inspectioneering Journal

Facilities that can successfully leverage both their data and expertise while effectively integrating this unified model into their core business processes can improve performance and eliminate non-value-added activities.

September/October 2020 Inspectioneering Journal

Fracture mechanics is a branch of engineering that describes the behavior of cracks – how they grow and when they fracture. Fracture of cracks is particularly dangerous because it can happen without warning under normal operating conditions.

Authors: Greg Garic, P.E.
Partner Content

Ethos has assembled a team of experts who apply what they learned through years of process safety experience in the industry and dealing with OSHA and EPA. Click here to learn more about our services.

September/October 2020 Inspectioneering Journal

This article presents a methodology for calculating and understanding how many qualified API inspectors you need to staff in order to improve fixed equipment mechanical integrity and reliability at your operating site.

Authors: John Reynolds
September/October 2020 Inspectioneering Journal

This article discusses some of the common roles of the RBI team and provides a glimpse of an RBI program gap assessment, while offering helpful advice for improvement.

Authors: Greg Alvarado
September/October 2020 Inspectioneering Journal

Understanding asset integrity and its management framework is important to sustaining the integrity of assets in the oil and gas industry. This article will discuss eleven primary elements that make up an asset integrity management program.

July/August 2020 Inspectioneering Journal

Inspectioneering and Pinnacle co-hosted their 6th bi-annual Meeting of the Minds roundtable discussion earlier this year. This meeting’s focus was on how Covid-19 and the decline in oil prices have affected MI programs across the industry.

Authors: Jeremiah Wooten
July/August 2020 Inspectioneering Journal

This article presents a model to better predict the corrosivity of hot crude oil streams, which is based on open literature going back for almost 60 years and incorporates published information from joint industry projects (JIPs).

Partner Content

Oceaneering's splash zone inspection services will help you confidently detect flaws and accurately extend asset life with our comprehensive inspection and fitness-for-service maintenance plans.

Online Article

Inspectioneering had the opportunity to catch up with David Clark of Lloyd’s Register after his keynote presentation at the 2020 International Pressure Equipment Integrity Association (IPEIA) conference in Banff, Canada.

Authors: Nick Schmoyer
March/April 2020 Inspectioneering Journal

This article presents a comprehensive integrity management program for catalyst tubes, including elements on monitoring, inspection, data analysis, remaining life assessment, and control of human factors.

Authors: Baher Elsheikh
Blog

The Journal was launched in 1995 with the core mission of helping the fixed equipment reliability community perform their jobs more effectively by arming them with information to better understand and apply available technologies and methodologies.

Authors: Greg Alvarado
November/December 2019 Inspectioneering Journal

This article introduces the P-F Interval and its importance in predictive maintenance, describes methods to detect failures early, and maps out a path to begin an effective Predictive Maintenance program at one’s facility.

November/December 2019 Inspectioneering Journal

This article wraps up the three part series by combining management systems to work towards the ultimate goal of achieving a defect-free operation in process plants.

Authors: Satwant Rakhra
Partner Content

Contact us at buddy@dimate.de to learn how DIMATE PACS digitizes NDT methods (RT, UT, VT, ...) and how it leads to paperless inspections.

November/December 2019 Inspectioneering Journal

Today's operators are implementing a myriad of Mechanical Integrity and Reliability programs to realize greater results from their facilities. However, for each of these programs to be effective, they must be fueled by quality and up-to-date data.

November/December 2019 Inspectioneering Journal

I have been involved with risk-based inspection and risk-based work process development for much of my career. The one thing I have learned as I’ve walked this path is that the concept of ‘risk’ extends far beyond our industry.

Authors: Brent Ray
November/December 2019 Inspectioneering Journal

Much like the equipment and piping they support, structures should be part of a comparable structural integrity (SI) program. This article will examine key components of a comprehensive SI program as an essential companion to an MI program.

Blog

Developing a comprehensive turnaround (TA) work scope for process equipment is a critical step for achieving a facility's business goals. Risk Based Work Selection is a proven process for prioritizing and optimizing planned work for an impending TA.

Blog

Risk Based Work Selection (RBWS) is an industry best practice used to help refiners better-manage the safety and reliability of operations for a facility. When properly conducted, RBWS can help refiners optimize major turnaround projects.

Partner Content

Companies have developed detailed programs for managing wide range of assets. However, unsustainability negatively impacts effectiveness of these programs. Reach out to us on how we can address sustainability through digital transformation.

July/August 2019 Inspectioneering Journal

This article provides a case study showing the real costs and effects of having a dated engineering standards program, as well as the financial benefits through increased reliability of having a thriving engineering standards program.

Authors: Jeannie Lewis
March/April 2019 Inspectioneering Journal

According to industry experts, particle contamination in lubricants is the number one cause of lubricant-related equipment failure. Fortunately, there are steps operators can take to reduce contamination and increase the service life of equipment.

Authors: Troy Goldman
March/April 2019 Inspectioneering Journal

This article describes some strategies owner/users can implement to reduce failure rates, eliminate wasteful activities, reduce costs, increase capacity, improve safety, and achieve the goal of defect-free operations.

Authors: Satwant Rakhra
January/February 2019 Inspectioneering Journal

This article provides a summary of the 2019 API Inspection & MI Summit keynote address, which offers a past, present, and future outlook on fixed equipment mechanical integrity from an industry professional with 50+ years of experience.

Authors: John Reynolds
January/February 2019 Inspectioneering Journal

A quest for a defect-free operation requires an effort to systematically reduce the current equipment failure rates. This series proposes a newer, leaner way of thinking to help discover and eliminate conditions that may lead to defects.

Authors: Satwant Rakhra
Partner Content

Lessen downtime by enhancing your plant infrastructure, ensuring mechanical integrity, and extending equipment lifespan. Contact us for on-demand engineering expertise in assessment, problem-solving, specialized testing, and preventative solutions.

January/February 2019 Inspectioneering Journal

An effective RBI system implementation results in, not only safeguarding your assets & people, but can also reduce unnecessary inspection activities that may be required due to conventional & nonsystematic approaches.

Blog

The 2019 API Inspection and Mechanical Integrity Summit will be kicking off later this month in Galveston, TX. This four-day event will begin with 14 high level training courses offered Monday, January 28th, and then a top notch conference and...

Authors: John Reynolds
November/December 2018 Inspectioneering Journal

This article discussed the importance of an asset management philosophy that integrates software, maintenance tools (RCM, FMECA, RBI, PM, and PdM), data collection, and analytics to improve and optimize asset management through emerging technologies...

Authors: Mike Asquini
November/December 2018 Inspectioneering Journal

This article provides an overview of the key components in establishing IOWs, the levels of IOW limits, and the basic principles and application of API Recommended Practice 584 to achieve reliable fired heater performance.

Authors: Tim Hill
November/December 2018 Inspectioneering Journal

This article walks you through a three-step approach, while providing different scenarios, for identifying and proving the value of reliability improvement initiatives.

Authors: John Campo
Partner Content

With the IMS Suite, you can calculate optimal intervention periods and lay out efficient maintenance strategies. Click here to learn more.

September/October 2018 Inspectioneering Journal

The most valuable unit of measure within a turnaround is not money, but time. Successful turnaround planners are now integrating the Detailed Inspection Planner (DIP) within their teams to increase the accuracy of planning and reduce the time...

May/June 2018 Inspectioneering Journal

As assets age and production demands grow, it becomes increasingly critical to implement sustainable long-term AIM strategies and programs. This article dives into the elements that will help ensure the successful management of assets throughout...

May/June 2018 Inspectioneering Journal

This article intends to use a top-down approach of describing RBI methodology and how it fits in a facility management system. The main idea of this article is to provide a comprehensive picture of RBI methodology in terms of basics, technology...

Authors: Dheeraj Narang
March/April 2018 Inspectioneering Journal

This article is designed to help the reader better communicate their FEMI Mission, Vision, Core Values and Responsibilities to all stakeholders at their site.

Authors: John Reynolds
March/April 2018 Inspectioneering Journal

Last November, Inspectioneering and PinnacleART hosted a roundtable discussion for a select group of leading mechanical integrity experts. This forum explored how the MI field will have to prepare for the impending loss of knowledge resulting from...

Authors: Tyler Alvarado
Partner Content

Meet our team at booth #1652 where we will be showcasing DIMATE PACS and our latest AI advancements. Our cutting-edge software is designed to revolutionize the way energy companies conduct inspections, improve asset safety, and increase margins.

Blog

Infrared (IR) thermometry has been used for over forty years to monitor tube metal temperatures in refining and chemical furnaces. Recently, IR thermometry has been criticized in the industry for delivering inaccurate readings; however, this is...

November/December 2017 Inspectioneering Journal

In this exclusive interview, you’ll hear from Eddie Acosta, Reliability Manager at Placid Refining. During our discussion, he shared some of their challenges, strategies, and a transparent glimpse into some the real issues in his 82,000 bpd...

Authors: Josh Means
November/December 2017 Inspectioneering Journal

APM implementation is anything but a pain-free process. Blame tends to fall on vendors, but there are oftentimes activities that do not get completed that tend to have a larger effect on the success of implementation. This article addresses some of...

Authors: Stephen Flory
July/August 2017 Inspectioneering Journal

3 common repair scenarios include routine maintenance, scope repairs, and major discoveries. An inspector’s ability to properly manage each situation can mean the difference between mechanical integrity success and failure.

Authors: Mark Savage
July/August 2017 Inspectioneering Journal

Most plants have pieces of equipment with chronic problems that impact profitability due to the frequency of outages, cost of repairs, and lost production. It is critical that specific actions are taken to identify and eliminate these “Bad...

Authors: Rick Hoffman
May/June 2017 Inspectioneering Journal

Risk is an inherent aspect of asset management. Unfortunately, controlling it is easier said than done. Risk must be managed beginning with the initiation of a project and lasting until completion. How can one implement a reliable risk management...

Authors: Mike Asquini
Online Article

The Valve World Americas Conference provides an opportunity for people from all sides of the flow control industry to come together to discuss experiences, share insights and work together to resolve common challenges. Sharing knowledge and...

March/April 2017 Inspectioneering Journal

Inspectioneering Founder & Chief Editor, Greg Alvarado, recently had the privilege to sit down with Clay White, Director of Mechanical Integrity for Phillips 66 (Downstream), to discuss the world of fixed equipment reliability in the refining and...

Authors: Greg Alvarado
March/April 2017 Inspectioneering Journal

Integrity Operating Windows (IOWs) have a subset of operating variables that are important for degradation monitoring, but may not have direct operational controls. Per API RP 584 Integrity Operating Windows, these are known as IOW Informational...

Authors: A.C. Gysbers
Online Article

Inspectioneering recently had the opportunity to sit down and chat with Cary Forgeron and Samuel Fisher about the importance of oil analysis to effectively managing the reliability of rotating equipment used in the the O&G and other processing...

Authors: Jeremiah Wooten
January/February 2017 Inspectioneering Journal

This article covers where to start, what to look for, and how to execute a data and systems-focused performance improvement project that can drive large overhead savings.

January/February 2017 Inspectioneering Journal

This article presents a perspective on the human factor and emphasizes the value of using risk tools at all levels in the organization to help provide management focus during times of severe economic pressure.

September/October 2016 Inspectioneering Journal

Integrity and reliability personnel at processing facilities are no strangers to initiatives to improve processes in the pursuit of establishing best-in-class reliability programs. It is common practice for operators to enlist help from third...

Authors: Kevin Birkby
March/April 2016 Inspectioneering Journal

Achieving fired heater reliability in conjunction with meeting performance standards can be a challenging feat. Performance is a measure of the degree to which the fired heater is in an operable condition at any given time.

Authors: Tim Hill
March/April 2016 Inspectioneering Journal

Inspectioneering recently had an opportunity to sit down with Walt Sanford, President and COO of Pinnacle Advanced Reliability Technologies, and discuss what Reliability means to his clients and others in our industry. We hope you find the exchange...

Authors: Jeremiah Wooten
January/February 2016 Inspectioneering Journal

Equipment integrity and reliability programs are essential for refinery and chemical facility operators. The processes of the programs are developed to ensure safety, optimize component life cycles, and promote smooth and economical operations.

November/December 2015 Inspectioneering Journal

This article highlights several benefits of sound reliability and mechanical integrity practices and how they serve as the cornerstone of effective asset management. Moreover, we believe effective asset integrity management is not only important,...

Online Article

Inspectioneering recently had the opportunity to sit down and chat with Brian Fahnestock about heat exchanger issues in the refining and petrochemical sectors and how temporary solutions can help mitigate the damage should a problem arise.

Authors: Jeremiah Wooten
September/October 2015 Inspectioneering Journal

Inspectioneering recently had the opportunity to sit down with Texas Railroad Commissioner Ryan Sitton and discuss the evolution of reliability in the oil and gas industry.

Authors: Jeremiah Wooten
September/October 2015 Inspectioneering Journal

Operators in all industries are trying to increase equipment availability, yet oftentimes critical process equipment is not available due to planned or unplanned maintenance. To increase equipment availability, steps must be taken to reduce...

Authors: Brad Moore
March/April 2015 Inspectioneering Journal

Today, many managers are finding that they can address the reliability of all types of assets by combining RBI and Reliability Centered Maintenance (RCM) processes together into one comprehensive reliability management process.

Authors: Walt Sanford
January/February 2015 Inspectioneering Journal

Reliability engineering tools and concepts can be used to avoid or delay failures, thus increasing product service life. Design or maintenance teams use reliability engineering techniques to identify failures and their causes.

Blog

In 2013 Inspectioneering published content covering a wide array of topics, from risk-based inspection, to advanced nondestructive testing methods, to pipeline integrity management systems. Last year, we published more content than any year prior;...

Authors: Nick Schmoyer
March/April 2012 Inspectioneering Journal

Risk Based Integrity Management (RBIM) is the latest process for developing strategies to properly operate and maintain a manufacturing or production facility in the Oil, Gas, and Petrochemical Industry (OG&P). RBIM is a significant change from...

Authors: Barry Snider
May/June 2011 Inspectioneering Journal

As the technology of NDT systems improve, it is important to assure that the people and processes using this technology are adequately prepared in order to take full advantage of the enhancements of the system.

Authors: Joey Poret
November/December 2006 Inspectioneering Journal

This series of articles describes the elements for a successful fixed equipment reliability program in a petrochemical facility. These articles will address management systems, engineering practices, preventive/predictive maintenance/inspection...

Authors: F. Walter Pinto
September/October 2006 Inspectioneering Journal

This series of articles describes the elements for a successful fixed equipment reliability program in a petrochemical facility. These articles will address management systems, engineering practices, preventive/predictive maintenance/inspection...

Authors: F. Walter Pinto
July/August 2004 Inspectioneering Journal

The following is the final part of a 2-part series outlining the relationship between key operating parameters and corrosion that has been used to develop a set of guidelines to define an operating envelope.

May/June 2004 Inspectioneering Journal

Corrosion and fouling in HF Alkylation Units are closely linked to feed quality and operating conditions. This article outlines the relationship between key operating parameters and corrosion that has been used to develop a set of guidelines to...

September/October 2000 Inspectioneering Journal

In part 1 of this article we covered the importance of quality assurance of UT data, that is, understanding for each particular application, the accuracy required of the UT data, and new ways/graphical program to analyze and show the...

January/February 1997 Inspectioneering Journal

This is Part II of a series of reliability of coke drums. Part I discussed some of the causes of bulging and cracking in coke drums. Here, the effect of operation on damage will be covered, along with possible solutions for increasing drum life...

November/December 1996 Inspectioneering Journal

Petroleum coke production is an important source of revenue for many refineries. While coking units were initially constructed to deal with a waste product, these units are now of significant economic value.

November/December 1995 Inspectioneering Journal

In the aging portion of an asset's life, the failure rate is exponential. This creates a need for predictive maintenance expenditures to maintain reliability.

Authors: David A. Mauney
    Videos related to Reliability
      White Papers related to Reliability
        Downloads & Resources related to Reliability
          Events related to Reliability
          • January 23 - 25 2024
            Location: San Antonio, Texas, United States
            Hosted By: American Petroleum Institute (API)
            Dates: January 23, 2024 - January 25, 2024
            Conferences Exhibitions & Trade Shows Training Courses
          • February 26 - 29 2024
            Location: Jasper, Alberta, Canada
            Hosted By: International Pressure Equipment Integrity Association (IPEIA)
            Dates: February 26, 2024 - February 29, 2024
          • February 26 - 28 2024
            Location: Baton Rouge, Louisiana, United States
            Hosted By: Materials Technology Institute (MTI)
            Dates: February 26, 2024 - February 28, 2024
            Conferences Exhibitions & Trade Shows
            News related to Reliability

              Inspectioneering Journal

              Explore over 20 years of articles written by our team of subject matter experts.

              Company Directory

              Find relevant products, services, and technologies.

              Training Solutions

              Improve your skills in key mechanical integrity subjects.

              Case Studies

              Learn from the experience of others in the industry.

              Integripedia

              Inspectioneering's index of mechanical integrity topics – built by you.

              Industry News

              Stay up-to-date with the latest inspection and asset integrity management news.

              Blog

              Read short articles and insights authored by industry experts.

              Expert Interviews

              Inspectioneering's archive of interviews with industry subject matter experts.

              Event Calendar

              Find upcoming conferences, training sessions, online events, and more.

              Downloads

              Downloadable eBooks, Asset Intelligence Reports, checklists, white papers, and more.

              Videos & Webinars

              Watch educational and informative videos directly related to your profession.

              Acronyms

              Commonly used asset integrity management and inspection acronyms.