Inspectioneering
Inspectioneering Journal

Cracking the Code of Supplier Quality Surveillance

How SQS Can Prevent Delays, Frustration, and Rework

By Roy O. Christensen, Integrity Specialist (RET) at Christensen Qualityworks Inc. This article appears in the March/April 2025 issue of Inspectioneering Journal.
7 Likes

Introduction

Supplier Quality Surveillance (SQS), also known as source inspection or vendor surveillance, is a critical process in project and supply chain management that ensures equipment and materials (i.e., deliverables) meet specified requirements, are complete and correct, and are delivered on time. SQS includes activities such as auditing, evaluating, inspecting, observing, and reviewing systems, including engineering and procurement, fabrication, manufacturing, and quality management. Unlike traditional ISO 9000 quality management programs, SQS is designed to effectively manage risks to project budgets and timelines.

SQS is distinct from traditional ISO 9000 quality management programs. While ISO 9000 emphasizes compliance with standardized quality systems, SQS is a tailored approach that effectively manages project-specific risks. Projects define their own SQS requirements based on their unique needs. When implemented effectively, SQS mitigates risks that lead to cost overruns, delays, rework, and waste [1]. Megaprojects often exceed budgets and schedules due to incomplete, incorrect, or late deliverables [2]. Most projects face similar risks, but effective SQS mitigates these challenges by maintaining consistency and preventing frustration.

For example, a test separator package (Figure 1) typically has source inspection at the supplier’s facility. This equipment, which includes fixed equipment, pressure piping, a pressure vessel, and structural steel, may also contain electrical components and other systems that require inspection.

Figure 1. Test Separator Package [3]
Figure 1. Test Separator Package [3]

SQS seeks to answer three critical questions about project deliverables before shipment:

  1. Do they meet specified requirements?
  2. Are they complete and correct?
  3. Will they be delivered on time?

This content is available to registered users and subscribers

Register today to unlock this article for free.

Create your free account and get access to:

  • Unlock one premium article of your choosing per month
  • Exclusive online content, videos, and downloads
  • Insightful and actionable webinars
GET STARTED
Interested in unlimited access? VIEW OUR SUBSCRIPTION OPTIONS

Current subscribers and registered users can log in now.


Comments and Discussion

There are no comments yet.

Add a Comment

Please log in or register to participate in comments and discussions.