Introduction

Fluid catalytic cracking units (FCCUs) have been fundamental to refinery operations and economics for many decades, with the very oldest operating units achieving 70 years of service. With no new refineries on the horizon for the United States and operating demands changing, maintaining these complex aging assets is a consistent and evolving challenge. This article looks at reliability issues common across many licensors, designs, and vintages to help give perspective on where issues may be waiting and how to handle them when they arise.

Proactive Solutions

One way to look at reliability is by breaking it into two main categories: proactive and reactive solutions. An example to draw from for a proactive solution is to look at the package delivery industry and the maintenance practices of their delivery trucks. It is not that often that you see a broken-down truck of a publicly owned package delivery company. The reason for this is the proactive approach these companies take in maintaining their trucks. If the trucks are not on the road delivering packages, they are losing revenue. Through data collection and reliable life prediction methods, these companies are replacing components on their trucks prior to failure. This similar proactive approach can be taken with fluid catalytic cracking (FCC) reliability to improve successful operations between scheduled outages.

Evaluation of Aging Equipment

This proactive approach in evaluating aging equipment starts with having a good documentation process that captures the original design information, inspection, operational, and repair history. Without this information, it is very difficult to do a thorough analysis of repair versus replacement on aging equipment.

One of the best ways to make an informed decision on aging equipment is to conduct a net present value (NPV) evaluation comparing the cost of repair versus replacement. In this example of a NPV analysis, an approximately 25-year-old FCC regenerator cyclone is analyzed. At 25 years, the regenerator cyclone is at the higher end of industry experience for the life of a cyclone. A multidisciplinary team of process, material, and mechanical subject matter experts (SMEs) reviewed historical information on the cyclones and conducted interviews with key staff members in the daily operations of the FCC unit. A detailed yearly cost analysis was performed, and the NPV is summarized in Figure 1.

The black diamond in Figure 1 represents the base case for the costs associated with replacing the cyclones and repairing the cyclones. The high and low values represent a sensitivity analysis on the base case where contingency was added for the replacement cost, and for the repair case, the cost was added for the difference between a replacement and repair turnaround duration, providing an overall potential cost range.

One of the key technical discoveries from the work was the prior cracking and repair of the primary cyclone hanger-to-cyclone welds. This cracking was attributed to sigma phase embrittlement in the 304H support material. The crack transferred the load to other components, which caused subsequent overload and cracking in other support areas. The shift in load and subsequent cracked support components caused an out-of-plumbness of the cyclone barrels and diplegs. Over time the out-of-plumbness will exaggerate erosion in the primary cyclone barrels, cones, and the dustpots resulting in a reduction of primary cyclone efficiency, higher erosion rates in the secondary cyclone, and higher catalyst carryover. The overall age of the cyclones and the cascading effect of issues was the main driver of the repair net present value being much higher than the cost of replacing the cyclones.

Figure 1. Net Present Value Cyclone Replacement Versus Repair
Figure 1. Net Present Value Cyclone Replacement Versus Repair

This content is available to registered users and subscribers

Register today to unlock this article for free.

Create your free account and get access to:

  • Unlock one premium article of your choosing per month
  • Exclusive online content, videos, and downloads
  • Insightful and actionable webinars
GET STARTED
Interested in unlimited access? VIEW OUR SUBSCRIPTION OPTIONS

Current subscribers and registered users can log in now.


Comments and Discussion

Posted by Spencer Richards on April 27, 2023
Good article. Hot spots are inevitable in FCC... Log in or register to read the rest of this comment.

Posted by Andy Gysbers on May 23, 2023
In evaluating cyclone repair verses replacement... Log in or register to read the rest of this comment.

Add a Comment

Please log in or register to participate in comments and discussions.


Inspectioneering Journal

Explore over 20 years of articles written by our team of subject matter experts.

Company Directory

Find relevant products, services, and technologies.

Training Solutions

Improve your skills in key mechanical integrity subjects.

Case Studies

Learn from the experience of others in the industry.

Integripedia

Inspectioneering's index of mechanical integrity topics – built by you.

Industry News

Stay up-to-date with the latest inspection and asset integrity management news.

Blog

Read short articles and insights authored by industry experts.

Expert Interviews

Inspectioneering's archive of interviews with industry subject matter experts.

Event Calendar

Find upcoming conferences, training sessions, online events, and more.

Downloads

Downloadable eBooks, Asset Intelligence Reports, checklists, white papers, and more.

Videos & Webinars

Watch educational and informative videos directly related to your profession.

Acronyms

Commonly used asset integrity management and inspection acronyms.