Date | November/December 2021 |
Volume | 27 |
Issue | 6 |
Return to Journal Index |
November/December 2021 Inspectioneering Journal Article Index
A historical review into the integrity of reformer furnaces since commissioning is discussed in this case study, along with other technical and engineering challenges, and the efforts to overcome them.
Introducing the IGS Tube Tech rover system, the next generation in autonomous cleaning technology, capable of removing more than 90% of fouling and restoring your fired heater convection sections to their original design thermal efficiency.
This article is Part 2 in a series discussing condition monitoring optimization where statistical inference techniques on the measured data can be utilized to provide reasonable expectations regarding the true extent of damage on the asset.
This issue of Damage Control offers a perspective on how to assess the different forms of wet H2S damage using modern FFS and computational analysis techniques with the safe operation of damaged pressure vessels, piping, and associated components.
Establishing a proactive touch point corrosion integrity management program using engineered on-stream line lifting is a safe and effective means of mitigating unplanned downtime and related safety and potential environmental hazards.
There are many excellent changes and updates in the new edition of API 579, including significant technical changes and improvements. In this FFS Forum article, I’ll go through many of what I believe to be the most important changes.
In cases where material embrittlement caused by hydrogen is a concern, evaluations using fracture mechanics to assess the reliability and integrity of steel pipes exposed to cyclic loads are necessary.
Dead legs pose a substantial threat to piping integrity as they are especially prone to contamination and corrosion. Tracking dead legs separately from the mainline piping should be done through controlled procedures at operating facilities.
With all the variables in play during a turnaround event, it is rare for all expectations to succeed together, during the same event. It is important to have a process in place, plan each step, and utilize certified inspection personnel.
Utilizing a risk assessment methodology to determine the amount of detail in our QA/QC plans, as well as who needs to be involved, may help us improve both the effectiveness and the efficiency of our QA/QC work process.