
Date | January/February 2020 |
Volume | 26 |
Issue | 1 |
Return to Journal Index |
January/February 2020 Inspectioneering Journal Article Index
Computerized Maintenance Management System (CMMS) platforms are a great way to structure, standardize, and streamline maintenance management. But how can you make sure you get a CMMS that effectively delivers on exactly what you need?
The health of piping and piping supports is critical to processing facilities, however there are very few facilities where a documented inspection program exists for spring supports. This article outlines some issues surrounding spring supports
Inspectioneering and PinnacleART co-hosted their 5th Meeting of the Minds roundtable last November in Atlanta. This meeting’s focus was on notable technologies and how they are changing the MI landscape.
There are many sources and occurrences of metal fatigue in the chemical and refining industries. They range from low-cycle thermal stresses in an FCCU, to the relentless pressure cycling of a PSA, to the ultra-high cycles of a rotating pump.
This case study discusses costly repairs that were needed on newly fabricated pressure vessels as a result of poor UT practices. The author shines a light on some industry problems that can be fixed with an understanding of what is actually required.
Decision trees can be used to help with decisions related to nearly any closed loop mechanical integrity or inspection workflow process. This article focuses on how decision trees can be applied to heat exchanger tubular inspection.
The purpose of this article is to describe some of the pitfalls that operating sites have encountered while trying to implement a program of IOWs in accordance with the guidance in API RP 584, plus how to overcome those pitfalls.
The bp refinery in Rotterdam was able to establish a continuous digital inspection process for the first time by using the DIMATE PACS – including the digital evaluation and transmission of quality-assured inspection data to the RBI.
The author will discuss the failure of a dissimilar joint while examining the root causes of the failure along with potential solutions and preventive actions that would not compromise the welding production rate.
This article addresses two failure events where inadequate attention to thermal fatigue led to premature equipment failure while specifying guidelines to help prevent such failures that can be a part of a plant's inspection and maintenance programs.