May/June 2014 Inspectioneering Journal Article Index
An adequate characterization of the Keystone XL special conditions from the perspective of pipeline integrity and risk would be advantageous from the system onset for identifying latent flaws in the system spill prevention plans.
Ensuring the integrity of process piping systems in the Oil & Gas industry (specifically those related to the ASME Code B31.3) is a key issue with respect to the process, business, safety, and the environment. However, in the current cost reduction...
As an RBI consultant, I frequently get involved in discussions spawned from a misunderstanding of the relation between Risk Based Inspection (RBI) approaches and Fitness for Service (FFS) assessments. Questions like: If thickness is below the...
The following interview with Rich Roberts provides answers to some of the questions our readers have about small, specially designed pigs carrying NDE technologies that can inspect nearly every area of a tube from the coils interior surface.
Several catastrophic spills over the past few years have sparked significant interest in oil spill prevention across the industry. Not only do facilities with large amounts of oil want to prevent environmental damage, loss of product, and civil...
Lessen downtime by enhancing your plant infrastructure, ensuring mechanical integrity, and extending equipment lifespan. Contact us for on-demand engineering expertise in assessment, problem-solving, specialized testing, and preventative solutions.
Inspections, repairs, modifications, or Fitness-For-Service (FFS) assessments on an old, unfired ASME Section VIII (Div. 1) pressure vessel - Which ASME Section VIII (Div. 1) Code Edition should you use?
In November 2013, ASME released its updated PCC-1 guidelines for pressure boundary bolted flange joint assemblies. Contained within the document is Appendix A, which represents a major change from the previous 2010 release and is considered to be...
There are typically three tiers to pass through for most fixed equipment mechanical integrity (FEMI) programs before they reach excellence in FEMI. In my 45 years in the FEMI business, I have observed FEMI programs in all three tiers (phases).