January/February 2006 Inspectioneering JournalBy John Reynolds at Intertek
After a pressure equipment or piping failure, it’s not uncommon to find out during the failure analysis part of the investigation that the failure initiated at a welding flaw of some sort.
-
January/February 2006 Inspectioneering JournalBy John Reynolds at Intertek
Among other things, a welding QA/QC program needs to ensure that only qualified welders, utilizing qualified procedures are allowed to weld on any pressurized equipment, including storage tanks and piping.
-
January/February 2006 Inspectioneering JournalBy Greg Alvarado at Inspectioneering Journal
This survey did not make metrics the primary focus. More importantly, our focus was on practices that lead to better performance. You still have to link these practices to performance.