
Date | September/October 2003 |
Volume | 9 |
Issue | 5 |
Return to Journal Index |
September/October 2003 Inspectioneering Journal Article Index
-
September/October 2003 Inspectioneering JournalBy P.E. Myers at Chevron Research & Technology Co.
Recently an unnecessary financial incident was caused as a result of an inadequate tank inspection and failure to recognize the hazards of rain entering leaking fixed roofs of storage tanks. A bolted bladder tank upgrade was scoped for miscellaneous...
-
September/October 2003 Inspectioneering JournalBy John Reynolds at Intertek
The API Inspection Subcommittee has issued the second edition of their inspection benchmarking survey. We are encouraging as many sites, worldwide, to participate as possible, so that we have the most amount of data available for analysis and...
-
September/October 2003 Inspectioneering Journal
API is currently developing a new Certification Program - Tank Entry Supervisor Certification (TES).