
Date | July/August 2000 |
Volume | 6 |
Issue | 4 |
Return to Journal Index |
July/August 2000 Inspectioneering Journal Article Index
-
101 Essential Elements in a Pressure Equipment Integrity Management Program for the Hydrocarbon Process Industry - Part 2July/August 2000 Inspectioneering JournalBy John Reynolds at Intertek
This paper outlines the 101 essential elements that need to be in place, and functioning well, to effectively and efficiently, preserve and protect the reliability and integrity of pressure equipment (vessels, exchangers, furnaces, boilers, piping...
-
July/August 2000 Inspectioneering JournalBy T.C. Ridgeway & Staff at TCRI
The American Paper Institute Recovery Boiler Reference Manual Volume 1, October 1979, indicates that the two main goals of conducting ultrasonic thickness (UT) inspections are to determine (1) the current tube wall thickness and (2) the rate of...
-
July/August 2000 Inspectioneering JournalBy Greg Alvarado at Inspectioneering Journal
Hundreds of risk based inspection analyses have been completed by contractors and owner users worldwide, by now. Much is being learned as the various approaches gain acceptance. This editorial is only one perspective built upon the experiences of...