
Date | July/August 1996 |
Volume | 2 |
Issue | 4 |
Return to Journal Index |
July/August 1996 Inspectioneering Journal Article Index
July/August 1996 Inspectioneering Journal
All FRP tanks should be fabricated to a national standard as a basic requirement. Additional requirements may be appropriate and should be agreed to by the purchaser and fabricator. Very acceptable basic standards are...
Authors:
John E. Niesse
July/August 1996 Inspectioneering Journal
Engineers and scientists at Southwest Research Institute (SwRI) in San Antonio, Texas, may have found a cost-effective and practical method of detecting ID and OD corrosion of insulated piping systems.
Authors:
Hegeon Kwun, Richard L. Lopushanksy
July/August 1996 Inspectioneering Journal
A set of delayed coker drums were placed in service in 1968, and now have 27 years of service in what may be the most violent and severe cyclic loading conditions of any petrochemical vessel. As part of the continuous evaluation of their integrity,...
Authors:
Richard S. Boswell, P.E.