Inspectioneering

Matt Stroh: About the Author

Is this you? Please help us keep this page up-to-date by occasionally submitting your updated information.


Published Articles

September/October 2014 Inspectioneering Journal

A small leak from top tubesheet-to-tube welds prompted further inspection of the 1¼Cr- ½Mo Ammonia Converter Boiler Feed Water (BFW) Exchanger during a planned shutdown. Further cracks were identified in the top channel to tubesheet butt weld that operated at 700 °F.